Free VCAP-NV Design 2020 3V0-42.20 Exam Question

VMware 3V0-42.20 Exam Syllabus Topics:

Topic Details
Topic 1
  • Create a Physical Design for NSX-T Data Center
  • Analyze Manageability Requirements
Topic 2
  • Analyze Recoverability Requirements
  • Create a Logical Design for NSX-T Data Center
Topic 3
  • Analyze Performance Requirements
  • Map Business Requirements to the Logical Design
Topic 4
  • Performance-tuning, Optimization, Upgrades
  • Planning and Designing
Topic 5
  • Analyze and Differentiate Requirements, Risks, Constraints, Assumptions and Use Cases Based on Current Customer Environment
Topic 6
  • Installing, Configuring, and Setup
  • Create a Conceptual Design for NSX-T Data Center
Topic 7
  • Create a Physical Design for NSX-T Data Center Compute
  • Analyze Availability Requirements

 

NO.11 Which three choices are part of a Design Approach when discussing design alternatives and their effects? (Choose three.)

 
 
 
 
 
 

NO.12 Which three assessment findings are part of a Conceptual Design? (Choose three.)

 
 
 
 
 
 

NO.13 Refer to the exhibit.

A financial company is adopting micro-services with the intent of simplifying network security. An NSX-T architect is proposing a NSX-T Data Center micro-segmentation logical design. The architect has created a diagram to share with the customer.
How many security levels will be implemented according to this Logical Design? (Choose the best answer.)

 
 
 
 

NO.14 An architect is helping an organization with the Conceptual Design of an NSX-T Data Center solution.
This information was gathered by the architect during the Discover Task of the Engagement Lifecycle:
There are applications which use IPv6 addressing.
Network administrators are not familiar with NSX-T Data Center solutions.
Hosts can only be configured with two physical NICs.
There is an existing management cluster to deploy the NSX-T components.
Dynamic routing should be configured between the physical and virtual network.
There is a storage array available to deploy NSX-T components.
Which two requirements were documented by the architect? (Choose two.)

 
 
 
 
 

NO.15 What would an architect recommend to a customer that wants to extend management to an additional data center through Layer 2, but does not want to add additional NSX-T licensing? (Choose the best answer.)

 
 
 
 

NO.16 An architect is designing a solution for containerization. The solution will include high availability and security using NSX-T Data Center. The architect plans to provide a basic required components list in the Logical Design.
Which solution should the architect recommend? (Choose the best answer.)

 
 
 
 

NO.17 A Solutions Architect is working with a customer which wants to extend their traditional Telco IP/MPLS core network to an NFV cloud.
Which NSX-T Data Center feature can be recommended by the architect? (Choose the best answer.)

 
 
 
 

NO.18 A customer deploying NSX-T Data Center requires role based access controls be enforced in NSX Manager with these requirements:
* identity platform must be highly available
* authentication must be performed by customer’s existing SAML identity provider
* MFA must be performed by administrator to gain access to NSX Manager
Which identity deployments would meet the customer’s requirements? (Choose the best answer.)

 
 
 
 

NO.19 Which type of design includes vendor models, host names, IP Addresses, port connections, logical unit number sizes, and number of CPUs? (Choose the best answer.)

 
 
 
 

NO.20 Which NSX-T feature is used to allocate the network bandwidth to business-critical applications and to resolve situations where several types of traffic compete for common resources? (Choose the best answer.)

 
 
 
 

NO.21 An architect is helping an organization with the Logical Design of an NSX-T Data Center solution.
This information was gathered during the Assessment Phase:
Data between two networks connected over a public network needs to be encrypted.
Certificate authentication is required.
Dynamic route learning is preferred.
Which selection should the architect include in their design? (Choose the best answer.)

 
 
 
 

NO.22 An NSX-T Architect is working in a brownfield environment with 4 ESXi hosts. These constraints were documented:
new servers cannot be purchased
North/South bandwidth must be guaranteed
Top-of-Rack switches have additional uplinks
Which three recommendations should the architect implement? (Choose three.)

 
 
 
 
 

NO.23 An architect is helping an organization with the Conceptual Design of an NSX-T Data Center solution.
This information was gathered by the architect during the Discover Task of the Engagement Lifecycle:
Existing hardware will be used in any design proposal.
Network bandwidth cannot be expanded.
Which concept of the Discover Task do these items belong to? (Choose the best answer.)

 
 
 
 

NO.24 An architect is helping an organization with the Logical Design of an NSX-T Data Center solution.
This information was gathered during the Assessment Phase:
Maximum performance and availability is required between the physical and virtual network.
Load Balancing service is required for back-end web servers.
NAT is required.
Which selection should the architect include in their design? (Choose the best answer.)

 
 
 
 

NO.25 A customer wants to place their NSX Managers in different subnets.
Which would an architect recommend to support the request? (Choose the best answer.)

 
 
 
 

NO.26 An architect is helping an organization with the Logical Design of an NSX-T Data Center solution.
This information was gathered during the Assessment Phase:
Customer currently has a single 10 host vSphere cluster.
Customer wants to improve network security and automation.
Current cluster utilization and business policies prevent changing the existing vSphere deployment.
High-availability is important to the customer.
Which three selections should the architect include in their design? (Choose three.)

 
 
 
 
 
 

NO.27 An architect is helping an organization with the Conceptual Design of an NSX-T Data Center solution.
This information was gathered by the architect during the Discover Task of the Enagagement Lifecycle:
There are applications which use IPv6 addressing.
Network administrators are not familiar with NSX-T Data Center solutions.
Hosts can only be configured with two physical NICs.
There is an existing management cluster to deploy the NSX-T components.
Dynamic routing should be configured between the physical and virtual network.
There is a storage array available to deploy NSX-T components.
Which constraint was documented by the architect? (Choose the best answer.)

 
 
 
 

NO.28 An administrator is asked to improve Recovery Point Objective (RPO) and Recovery Time Objective (RTO) for Disaster Recovery (DR) in their company network. The network has a primary site and a secondary site. The ability to support outages with minimum loss of connectivity to the company’s core application is a priority.
Which design should the administrator recommend? (Choose the best answer.)

 
 
 
 

NO.29 Refer to the exhibits.
Design Option1:

Design Option 2:

Design Option 3:

Design Option 4:

An architect is helping an organization with the Conceptual Design of an NSX-T Data Center solution.
The conceptual design includes these requirements, assumptions, constraints, and risks:
Critical applications must run across sites without changing IP address.
Business continuity and disaster recovery (BCDR) plans will leverage a second site running vSphere.
RTO/RPO must be reduced for recovery of applications on secondary site.
IT Teams require automation tools for configuration.
Which Conceptual Design would the architect recommend to the customer? (Choose the best answer.)

 
 
 
 

NO.30 Which selection is associated with the Review Task of the Engagement Lifecycle? (Choose the best answer.)

 
 
 
 

NO.31 A Solution Architect will be deploying an Ethernet Virtual Private Network (EVPN) in their NSX-T Data Center environment.
What two selections must be prepared for the EVPN deployment? (Choose two.)

 
 
 
 
 

VMware 3V0-42.20 Actual Questions and Braindumps: https://www.prepawaytest.com/VMware/3V0-42.20-practice-exam-dumps.html

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below